&&
  • Home
  • About us
  • Certificate
  • Products
  • Cases
  • Cooperation
  • Contact us
  • Media Contact
industrial repair agent > high temperature copper rebuilding compound repair agent

high temperature copper rebuilding compound repair agent

high temperature copper rebuilding compound repair agent

BD119 high temperature copper metal rebuilding compound repair agent

Product description:
It’s the high temperature high performance polymerization metal materials compounded by various alloy material and 
modified toughening heat resistant resin.The highest temperature resistance is 300¡æ,suitable for the brass,
bronze casting defect repairing and copper parts wear repairing under the high temperature working condition,
the color after repairing is basically the same as the brass,with the very high strength and excellent wear & corrosion resistance and aging resistant properties,can do various mechanical processing together with substrates.
 
Product index of our BD119 high temperature copper metal repair agent epoxy compound:

product name physical 
state
standard 
packaging
volume
(cm3)
operational 
time limit
(25¡æ)
usable 
time
(25¡æ)
BD119 high temperature 
copper repairing agent
paste 250g/set
 Two-component
178 45min 24h
 
color density
(g/cm3)
compressive strength
(Mpa)
GB1041-2008
shear strength
(Mpa)
GB7124-2008
bending strength
(Mpa)
GB1042-1999
hardness
£¨Shore D£©
ASTM-D-2556
working temperature
£¨¡æ£©
brass 1.41 92 16 48 86 -60¡«250
 
How to use:
1.Surface treatment: Do the coarsening treatment on the pending-repair or needing-bonding area,
then clean it by cleaning agent
 
2.Configuration: According to the mass ratio A:B=4:1 or volume ratio A:B=4:1, make A and B two components mix uniformly,
then use it up within specified operation time limit.
 
3. Coating: Make the mixed-up material spread coating on the pending-repair areas layer by layer,the first layer should be compacted,make it infiltrate fully with the substrates.
If the following working procedure needs machining,should keep out appropriate machining allowance.
 
4.Curing: cure for 2 hours at the temperature of 25¡«30¡æ,heat it up to the temperature of 80¡æ and keep this temperature for 2 hours or cure for 24 hours at the temperature of 25¡«30¡æ before using,if the temperature is low,should heat it up or prolong the curing time to promote the curing.
 
Packaging specification:
Two-component,250g/set,8 sets/carton or 16 sets/carton.
 
Transportation storage:
Sealed storage in the cool and dry place.The warranty period is 12 months.Avoid placing it upside down,
knocking against and transporting it as a non-dangerous product during transportation.

Product packaging photo of BD119 high temperature metal copper repair agent epoxy putty two parts paste compound:
 
 
 
                              
 
 

------·Ö¸ôÏß----------------------------
abrasion wear
resistant coating
crusher backing
compound
anti corrosion
resistant coating
slurry pump
repair coating
industrial ceramic
epoxy adhesive
rubber liquid
coating
thermal heat
insulation coating
skid resistant
coating
heat conduction
coating
thermal conductive
adhesive
high temperature
resistant adhesive
high strength
structural adhesive
industrial repair
agent
rubber metal
bonding adhesive
elastic flexible
adhesive
high temperature
anti seizure compound
high temperature seize
resistant agent
bearing anti wear
fastening adhesive

CEO Email: jimmy@realbond.net        Tel:86-0710-3122805        Fax:86-0710-3618337